Maricopa County Department of Transportation:
Patton Road/Jomax Road Corridor Study

PHOENIX, ARIZONA
  

Maricopa County Department of Transportation: Patton Road/Jomax Road Corridor Study
SAGE is contracted with the CK Group, Inc. to prepare an Environmental Overview (EO) document as part of this corridor study. The EO identifies the potential “fatal flaws,” obstacles, issues, and sensitive areas. SAGE is also surveying, permitting, and identifying agency coordination requirements and future NEPA clearance requirements. SAGE is coordinating with the AGFD, USFWS, MCDOT, and other local agencies to document the physical and natural environment, the socioeconomic environment, and the cultural resources within the study area.
  

next
2315 E. Speedway Blvd. Tucson, AZ 85719  Tel: 520.740.0950  Fax: 520.740.0707 | 7537 E. McKinley, Suite 100  Scottsdale, AZ 85257  Tel: 480.894.2399  Fax: 480.874.2398
  
 
Copyright © 2007 SAGE Landscape Architecture & Environmental.
Email our Tucson office: info@sagelandscape.com
Email our Tempe office: info@sagelandscape.com